Boiler Tube
Our boiler tubes are characterized by high temperature resistance (up to 700℃), high pressure resistance (supporting supercritical unit conditions) and excellent corrosion resistance, covering international standards such as ASME SA210 A1 and SA213 T91/T22. Suitable for power station boilers, petroleum refining, chemical equipment and other demanding scenarios. Covering carbon steel (SA106B/C), alloy steel (15CrMoG) and stainless steel (TP304H/316L), to meet the needs of all scenarios from low to medium pressure to ultra-high pressure; relying on intelligent inventory management, full-size coverage of the spot, the fastest delivery of transnational orders is 15 days, and the urgent demand can be reduced to 2 days, and through the ISO9001, CE, the European Union PED and other certificates, in line with the environmental protection standards, to help the global energy transition. Helping the global energy transition.
WhatsApp :+86 19026837752
Phone :+86 19026837752
Email :admin@cnjinxisteel.com

PRODUCT PARAMETERS


Product Name

ASTM A192 seamless Carbon Steel Pipe /Boiler Tube

Material

Q195, Q235, Q345; ASTM A53 GrA,GrB; STKM11,ST37,ST52, 16Mn,etc.

Wall Thickness

0.7MM~30MM

Length

Length:Single random length/Double random length5m-14m,5.8m,6m,10m-12m,12m or as customer's actual reques

Standard

JIS G3466, EN 10219, GB/T 3094-2000, GB/T 6728-2002

Grade

Grade A, Grade B, Grade C

Section Shape

Square, Rectangular, Round,

Technique

ERW Steel Pipe

Packing

Bundle, or with all kinds of colors PVC or as your requirements

Ends

Plain end/Beveled,protected by plastic caps on both ends, cut quare,grooved,threaded and coupling,etc.

MOQ

1 Tons, more quantity price will be lower



Surface Treatment

1. Galvanized2. PVC,Black and color painting3. Transparent oil,anti-rust oil4. According to clients requirement



Product Application:

1. Fence, greenhouse, door pipe,greenhouse2. Low pressure liquid, water, gas, oil, line pipe3. For both indoor and outdoor the building construction4. Widely used in scaffolding construction which is much cheaper and convenient

Certificates

API ISO9001-2008,BV

Delivery Time

Usually within 10-45 days after receipt of advance payment

PRODUCT SHOW

锅炉管.jpg

PACKAGING AND TRANSPORT

FAQ

Q1. What is your terms of Packing?

A: Generally we pack your goods with Neutral English bag, PP Woven bag with PE inner bag. If you have your own legally registered sack design, we can pack your goods with your brand and design bags after getting your authorization letter.

Q2. What is your terms of payment?

A: Normally 30% TT as deposit in advance, and 70% TT after email the copy of BL. Or LC at sight. We'll show you the photos pf your goods and package before you arrange the payment.

Q3. What is your terms of delivery?

A: Normally we do FOB, CFR, CIF terms.

Q4. How about your delivery date?

A: Normally it will takes 10~15 days after receive the deposit. The specific delivery time depends on the items and the quantity of the order.

Q5. Can you produce according to the sample?

A: Yes, we can produce by your samples or the specification you provide.

CONTACT US

PRODUCT RECOMMENDATION